How do you know a redesign helped?
The honest test is whether enquiries held or improved after the change, measured the same way before and after.
The test of a redesign is whether the people who pay you noticed a difference in the enquiries. Not the bounce rate, not the time on page, not the compliments from friends. Set the measurement before the work starts, so the comparison is fair and you know what a result looks like.
Pick one number that matters: calls, emails or booked jobs. Count it for a month before the change, and count it for a month after, using the same tracking. A redesign that lands in a quiet season will look worse than it is, so note the season and the ad spend too.
Then ask the people who use the site. A short conversation with three customers will tell you more than a heat map, and it is faster. If they found what they needed, the redesign did its job, even when the graph is flat for a month.

Checklist
- Choose one number that matters
- Measure it for a month first
- Note the season and the spend
- Ask three customers what they found
Print it, or send it to the person who owns the phone.
A question this raises
What should I do if enquiries drop after a redesign?
Check the basics first: redirects, phone links, indexing and page speed. Most drops after a redesign are technical rather than a matter of taste, and they are usually found within a week of careful checking.
Keep reading
How much should a website cost in Vancouver?
Vancouver website prices run from a single landing page to a full build with booking, and the difference is scope, not mystery.
What belongs in the first screen of a website?
The first screen has to say what you do, where you do it and how to reach you, before anything else loads.
Why does page speed beat page count?
A faster page keeps more readers than a bigger page, and most speed problems are images that were never resized.
Talk to a person, not a pipeline
Call, text or email. You reach the person doing the work, and you will be told honestly whether we can help.